L&T Bags Contract For Bullet Train Project To Supply 28 Steel Bridges

The Heavy Civil Infrastructure business of L&T Construction has secured a Significant contract from two packages [P4(X) & P4(Y)] of the Mumbai Ahmedabad High Speed Rail Corridor to Procure, Fabricate, Assemble, Paint and Transport 28 bridges – steel truss superstructures with bearings – to various sites that will cross over roads/ rivers/ railway lines and other structures.
The project was secured through a consortium of L&T and IHI Infrastructure Systems (IIS) of Japan.

Related Articles

Back to top button