NTPC Group Installed Capacity Reaches 74758 MW
With the successful commissioning of Unit#2, the standalone installed capacity of NTPC reaches an impressive 58,638 MW
![](https://indianpsu.com/wp-content/uploads/2024/03/IMG-20240301-WA0000-780x470.jpg)
NTPC Ltd., India’s largest integrated power company, successfully announces the commercial operation of Unit#2 (800MW) of Telangana Super Thermal Power Project (STPP), Stage-I (2X800 MW) w.e.f. 00:00 Hrs. of 01.03.2024.
With the successful commissioning of Unit#2, the standalone installed capacity of NTPC reaches an impressive 58,638 MW. Furthermore, in the group category, NTPC’s commercial capacity reaches 74,758 MW.